# ERP integration scope worksheet

Use this worksheet to request comparable proposals. Replace each blank with a
confirmed answer, an assumption, or "to verify" and name the person who will
confirm it. It is a planning aid, not a price estimate or a delivery commitment.

## 1. Systems and access

- Business / project:
- Business decision owner:
- ERP name, version, hosting, and company/entity:
- Source application and version:
- ERP vendor / support contact:
- Interface documentation and supported connector options:
- Verified read and write actions (record the evidence):
- Test environment and responsible administrator:
- Permissions and authentication setup owner:
- Required licences, vendor work, and known restrictions:
- Access questions still to verify, owner, and target decision date:

## 2. One data-flow record — repeat for every flow

- Flow name and business purpose:
- Source and destination:
- Record type and required fields:
- Trigger and permitted delay:
- Approximate daily volume and peak workload:
- System authoritative for each changing field:
- Customer, product, service, and other identifiers to match:
- Transformation, units, amounts, and rounding rules:
- Approval requirements and decision owner:
- What counts as success and which destination reference is saved:
- Duplicate submissions and retry behaviour:
- Missing data, validation failure, and conflicting updates:
- Lost response: how the destination result will be checked before retrying:
- Who sees failures, receives alerts, and resolves exceptions:
- Historical records included, excluded, or separately assessed:
- Unverified capabilities and who will check them:

## 3. Acceptance and rollout

For each case, record the input, expected result, observed result, and reviewer.

- Valid record:
- Missing required field or unmatched identifier:
- Repeated submission of the same record:
- Rejected destination request:
- Lost response after the destination may have created a record:
- Temporary outage and controlled recovery:
- Agreed peak workload and acceptable delay:
- Access by an unauthorised user or service:
- Reconciliation between approved source records and destination references:

Also agree:

- Business reviewer and technical reviewer:
- Pilot boundaries and reconciliation procedure:
- Criteria for pausing transfers and the recovery / rollback procedure:
- Training, documentation, account access, and handover deliverables:
- Person responsible for each system and for the connection after launch:

## 4. Cost and responsibility checklist

Ask suppliers to mark each item as included, excluded, estimated, or to verify.
For a priced item, record whether it is one-off, recurring, or usage-based; the
billing unit; who pays; and the assumptions behind the charge. Compare proposals
over the same planning period and with the same expected usage.

| Item | Included / excluded / unverified | Charge basis and assumptions | Owner / payer |
| --- | --- | --- | --- |
| Discovery and feasibility deliverables | | | |
| Connection and data mapping | | | |
| Business rules and approvals | | | |
| Failure handling and recovery controls | | | |
| Testing and rollout | | | |
| Data cleaning and historical migration | | | |
| ERP vendor assistance and licence changes | | | |
| Connector or other third-party subscriptions | | | |
| Hosting, monitoring, and backups where needed | | | |
| Support coverage and compatibility checks | | | |
| Documentation, training, and handover | | | |
| Future fields, workflows, and vendor upgrades | | | |

## 5. Decision before approving development

- Which interface capabilities have actually been demonstrated?
- Which assumptions could change the price or approach?
- What is the first release, and what is explicitly deferred?
- What do we receive from discovery if we stop before development?
- Are acceptance, operating responsibility, and recurring charges clear?
- Who approves changes to the agreed scope?

Prepared by Techlications Ltd. Accompanies:
https://techlications.com/insights/erp-integration-cost/