Establish what the current system can support
Start with the business task that has become difficult. Ask the people doing it to show a routine case and an exception. Then separate the missing capability from the condition of the application, its hosting, and its connections. A slow approval process and an application that can no longer receive necessary updates call for different work.
- Record the exact application, database and hosting versions. Get the supplier's support position, upgrade options, and relevant end dates in writing.
- Check available configuration and extension points, permitted interfaces, export formats, access rights, and a way to test changes.
- List the workarounds staff use and the records, attachments, and reports they need to complete the task.
- Name the business owner and technical support owner. Establish who can approve changes and keep the existing service running during a transition.
GOV.UK's government guidance identifies unavailable supplier support, blocked service changes, costs, and risk as reasons to consider migration. It also highlights dependencies and poorly understood data as migration blockers. These are useful assessment questions for a commercial business. See its guidance on managing legacy technology.
Use evidence to choose what to investigate
Use this decision table with your supplier. Each approach needs a feasibility check against the actual system and the period for which you expect to use it.
| Approach | Evidence that favours it | Prove before approval |
|---|---|---|
| Extend | The core workflow still fits. Supported configuration or an extension can add the missing field, rule, report, or screen. | Demonstrate the change in a test environment, its effect on existing workflows, and how it will be maintained through upgrades. |
| Integrate | The core remains supportable. The gap sits between systems or in a separate task, and an approved API, connector, or file exchange can carry the required records. | Demonstrate permissions, data mapping, failure recovery, reconciliation, and who supports each side of the connection. |
| Replace | Essential needs remain unmet, necessary updates or support are unavailable, or the business cannot accept the cost and risk of continued operation. | Demonstrate the critical workflow in the proposed replacement and rehearse data migration, dependent connections, staff access, and recovery. |
Compare ongoing licences, support, internal effort, connection maintenance, and eventual retirement alongside development costs. Include the temporary cost of operating both applications during a phased move. If replacement is justified, the next purchasing decision can use the separate custom software and off-the-shelf comparison.
Map what would stop working if the old system closed
Follow one record from creation to its final use. Include scheduled exports, emailed files, spreadsheet reports, and tasks performed by a supplier. For each dependency, record the following in a worksheet.
- Business use and owner. Name the person who needs the output and the task it enables.
- Records and timing. Specify the identifiers, fields, attachments, frequency, and permitted delay.
- Authoritative system. State where each record can be created or changed before, during, and after migration.
- Transition method. Record the verified interface or export, the supplier responsible, and how missing or repeated records are detected.
- Retirement condition. Define the evidence needed to remove the dependency, including usable access to required history.
Microsoft's Strangler Fig pattern describes moving functionality in stages while the original system continues to operate. Its guidance calls out shared data and calls between migrated and unmigrated parts. Check whether your system exposes the points needed to redirect work and can remain operational throughout the transition. See the Microsoft architecture guidance.
A first release for a field-service business
Hypothetical example. A servicing company uses an older job-management application for scheduling, engineer notes, attachments, and invoice exports. Its supplier has confirmed that support ends at the next renewal and can cover the agreed migration window. Customer accounts and issued invoices already belong to a separate, supported accounting system.
The business needs a better engineer screen and a route off the old application. An extra screen connected to the existing job engine would retain that dependency. The proposed first release therefore replaces job management for the North team, whose engineers and schedule can be operated independently of the other teams.
- Prove the complete job flow. Demonstrate booking, assignment, completion, attachments, and invoice preparation using representative jobs. Confirm customer access through the accounting system's supported interface.
- Rehearse the North data move. Copy open and completed-but-unbilled jobs, required attachments, customer references, and prior export status. Preserve a traceable link to each original job.
- Switch record ownership. During an agreed pause in North edits, apply the final changes and reconcile the import. Make North jobs read-only in the old application, then direct North staff and incoming work to the replacement.
- Keep billing and reporting complete. Route North invoice preparation through the new application and other teams through the old one. Carry existing invoice references forward and reconcile combined reports by team and job reference.
- Define the exit from coexistence. Migrate the remaining teams after the pilot checks pass. Verify the historical archive, replace remaining exports, and close the old application when its business dependencies have been removed.
A report covering all teams and a completed job awaiting billing are useful trial cases. Include them even when the first demo focuses on the engineer screen. Agree how support and access to historical records will be funded throughout the move.
Agree what must pass before switching work over
For the hypothetical North pilot, attach these proposed checks to the release decision and name the person who accepts each result.
- The imported jobs reconcile by reference, status, customer, and unbilled value. Required attachments open against the correct job, and exceptions have an agreed resolution.
- North staff can complete the full job flow with their assigned access. Attempts to edit North jobs through old screens and integrations are blocked after cutover.
- A previously exported job retains its invoice reference. Repeating an export or interrupting a submission leaves a traceable outcome and creates one intended invoice record.
- A combined report includes North and other teams once each. Finance can trace every included job to its authoritative application and explain any difference from the agreed control totals.
- The team rehearses a failed launch, including new jobs and changes entered after cutover. The recovery plan identifies who can stop work, which transactions must be preserved, and whether to restore service in the old system or repair the new one.
AWS's cutover guidance distinguishes rollback before new data arrives from rollback after the new environment has accepted transactions. In the latter case, restoring those transactions may be necessary. Apply that distinction when rehearsing the recovery plan and setting a decision deadline. See the AWS cutover and rollback guidance.
Bring the supplier's support position, dependency worksheet, sample records, and proposed pilot to your custom software project brief. Techlications scopes commissioned software and integration projects around the required workflow, verified connections, and agreed acceptance checks.