What must be checked first?
Identify the ERP name, version, hosting arrangement, and vendor or support contact. Then confirm whether the required information can be read and written through an approved interface. Microsoft’s Business Central API reference is one example of documented ERP interfaces; your system’s capabilities need their own assessment.
- Connection: Is there an API, supported connector, or approved file import? What permissions, licences, and usage limits apply?
- Data: Which customer IDs, product codes, units, prices, and order references does the ERP require?
- Destination: Should the integration create a draft order, a confirmed order, or a record for review?
- Testing: Is there a test environment or another agreed way to verify the connection before live use?
If there is no suitable interface, discovery should compare an approved import process, a vendor-supported extension, and a smaller workflow that stops at a reviewed export. The connection method shapes the scope.
If supplier support or required upgrades put continued use of the ERP in question, assess the wider decision with our guide to extending, integrating with, or replacing a legacy system.
What could a first release include?
For a wholesaler receiving emailed orders, an illustrative first release could cover one inbox, one order type, and one destination system:
- Capture: Receive an order and retain a reference to the original request.
- Prepare: Put the customer, products, quantities, and requested delivery date into a consistent draft.
- Validate: Match identifiers, check required fields, and flag ambiguous or missing information.
- Review: Let a team member correct and approve the draft before it is submitted.
- Confirm: Record the ERP response and show a clear status, including any error that needs action.
Structured forms or files may only need conventional automation. Variable email text may benefit from AI-assisted extraction. The required steps determine the approach; read our guide to AI agents and workflow automation for that decision.
How do you know it works?
Agree test cases before development, using representative orders with known expected outcomes. For example:
- A valid, approved draft creates one order and stores its ERP reference.
- An unknown product is flagged for correction before submission.
- Receiving the same order twice does not create a second ERP order.
- A failed connection leaves a visible pending or failed status, with a controlled way to retry.
- A rejected draft stays out of the ERP and records why it was rejected.
Choose a business measure too: time spent reviewing each order, corrections per order, or the number of orders awaiting action. Establish a baseline from the current process and compare it during the pilot. These are proposed measures, not promised results.
What shapes the cost and timeline?
The main variables are connection access, the number of order formats, data quality, approval rules, and exception handling. A reliable interface with consistent product codes is a different scope from several legacy systems and free-text orders that need frequent interpretation. Hosting, vendor charges, AI usage where applicable, and support should be stated alongside the development quote. Use our ERP integration cost worksheet to define those items and compare proposals against the same scope.
Bring these to a discovery conversation
- Your ERP name and version, plus any available integration documentation.
- Three representative order examples, including one that needs manual correction.
- A walkthrough of who receives, checks, approves, and enters an order today.
- Your approximate order volume, common errors, and preferred first improvement.
Techlications scopes this as commissioned software and integration work. The proposal should define the supported order types, connection method, review steps, acceptance criteria, and handover responsibilities.